We set up the connection for ATU by following the procedure in the ELS desktop. This is a no load, open circuit test.
After that we connect the power meter and measure unit with this GPIB - GPIB cable then the output is connected to desktop using GPIB - USB cable.
We activate the test bench to test ATU unit after finish setting up all the connection.
Our software is a success as it can show all the readings on the screen accurately. However we experience some delay with the export button. Our next task is to improve the speed and export the data to excel format with specified row and column.